Read the right itself
Permanent corridor, temporary work area, maintenance access and safety restrictions may differ. In three-dimensional projects, state the vertical reference for depth and height. An unclear right produces an unclear valuation.
Consider the whole property
Building, farming, access or economic use outside the narrow corridor may also be affected. Article 11 focuses on reduction in value. A fixed 30% or 50% for every project is not a general statutory rule.
Tunnels and safety
Article 4's underground and overhead provisions depend on ownership use and safety. Examine depth, ground effects, settlement risks and surface use with technical evidence. Physical building damage may require evidence separate from easement valuation.
Corridor example
For a stated ten-metre corridor, do more than measure line length. Verify closed registration geometry, parcel intersections, types of rights and temporary limits. A position error can identify the wrong owner or area.
Checklist
- Separate permanent and temporary rights.
- State levels, datum, projection and corridor boundaries.
- Document permitted and prohibited uses.
- Explain the whole-property value effect.
Read together
Sources and publication date
Source archive: 28 November 2026. This publication does not update automatically. Check the applicable official Turkish text and effective dates for the actual transaction.
- Ministry of Justice · Law No. 2942, consolidated official text ↗
Statutory passages, amendment notes and commencement table; source dated 28 November 2026.
General explanatory material. Determine rights, periods, jurisdiction and compensation from the applicable documents and current official law.